What is MEP?



C.space | Event information group
Zalo Community
Scan this QR code
to join the community

Open the QR
scanner on Zalo
Scan the QR code
on screen
Join
the community
Stay updated on the latest event news
01
02
03
04

What is MEP?
MEP stands for Mechanical, Electrical, and Plumbing. MEP constitutes a critical element of interior design, serving the comfort, health, and safety of the people who occupy the space.
Water Supply and Drainage Systems
Particularly vital in bathrooms, kitchens, and other areas requiring water, plumbing systems must be both efficient and seamlessly integrated into the overall design.

All electrical components — including lighting, power outlets, and the associated wiring systems.
Effective lighting design and the strategic placement of power outlets are essential to both the functionality and the interior environment.

ELECTRICAL
HVAC systems (heating, ventilation, and air conditioning).
Interior designers must ensure these systems are well integrated without compromising design elements.

MECHANICAL

PLUMBING

Do interiors frequently encounter problems related to MEP?
Electrical Systems


Cooling and Ventilation Systems
-
No technical shafts allocated for the system.
-
Insufficient space for the installation of trunking, air boxes, air ducts, and refrigerant lines.
-
Air conditioning units are obstructed in ways that directly affect their operating principles, reducing both efficiency in use and equipment lifespan.

Plumbing Systems
-
No technical shafts allocated for the system.
-
No ceiling access panels provided to enable maintenance work.
-
Insufficient space for the installation of supply and drainage piping systems.
-
Control cabinets and pump equipment concealed or located in positions that hinder maintenance and complicate incident response.

Extra-Low Voltage (ELV) Systems
-
No technical shafts allocated for the system.
-
No ceiling access panels provided to enable maintenance work.
-
Equipment installed in concealed positions to enhance aesthetics, thereby negating the operating principles of the equipment.
-
Insufficient space for the installation of trunking and electrical conduit systems.
-
No ceiling access panels provided for housing lighting drivers and control devices, or for equipment maintenance.
-
Electrical panels concealed or located in positions that hinder maintenance and complicate incident response.

6 CORE ISSUES DRAWN FROM THE REALITY OF VIETNAM'S MEP INDUSTRY
1. Conflict and lack of coordination between disciplines
(Clash Detection)
Loose coordination between Architecture, Structure, and MEP from the earliest design stage gives rise to countless conflicts: pipes colliding with beams, air ducts encroaching on ceiling heights, electrical panels placed in the wrong locations. The consequence is on-site demolition and rework, escalating costs and delaying schedules.
2. Barriers to the adoption of BIM technology
(Building Information Modeling)
Although the Government has established a mandatory roadmap, BIM implementation still faces numerous obstacles: high costs for software, hardware, and training; many projects use BIM merely to "redraw" attractive 3D documentation, without harnessing core values such as clash management, quantity take-off (5D), or operations management (7D).
3. Pressure from continuously changing technical standards
and regulations
QCVN 06 (Fire Prevention and Fighting) is being progressively tightened, forcing many newly approved design documents to be reworked. Meanwhile, the green building trend (LEED, LOTUS, etc.) under QCVN 09 demands the integration of smart solutions (BMS, DALI, Smart Lighting), yet many domestic firms' system-integration design capabilities remain inadequate.
4. Distortion of material quality and the Value Engineering equation
Price competition pressure leads many contractors to submit low bids and subsequently substitute inferior materials. While the initial investment cost is low, long-term operations and maintenance (O&M) costs prove far higher, causing losses for the investor.
5. A shortage of MEP Coordinators with a holistic vision
Vietnam does not lack engineers specialized in individual disciplines, but it does lack MEP Coordinators—professionals capable of orchestrating all systems together. A "stay in your own lane" mindset leaves construction teams working in isolation, competing for technical space, and passing difficulties on to one another.
6. Testing and Commissioning is not given due regard
Testing & Commissioning (T&C) is often treated as a final formality and squeezed by the schedule. The absence of a rigorous, independent T&C process (verifying the interlock between fire prevention, elevators, backup power, air conditioning, etc.) means that completed projects, once operational, are prone to faults and fail to achieve their designed performance.
MEP IN INTERIORS 2026 THEME
CLOSE COORDINATION BETWEEN MEP & INTERIORS
Focusing on close coordination between MEP design and interior design across living, working, and everyday spaces, from the very earliest stage.
EVENT OBJECTIVES
Homeowners are equipped with knowledge of how MEP directly affects their health and living experience, enabling them to make optimal choices from the outset and minimize the risk of later changes and repairs.
01
02
![]() |
|---|
![]() |
![]() |
Designers and contractors reconsider how interior and MEP design are coordinated from the earliest stage, applying this to their work to elevate the quality of their services and their professional reputation.
AGENDA
Morning 18.06
09:00 - 09:45
09:45 - 10:00
Guest reception
Opening speech by C.space and sponsors
10:00 - 10:45
Session
Coordination between MEP & Interior Design in the finishing phase: Practical insights and lessons learned
Mr. Nguyễn Minh Hà
Director of ME Division,
Wealthcons Construction Investment JSC
10:45 - 11:30
Session
The Paradox of the Modern Home — Solutions for Pure Air
Mr. Trịnh Thanh Hà
KNX Advanced Certified - MEP Integrate Expert
Morning 19.06
09:00 - 10:00
10:00 - 10:30
Session
Guest reception
When Switches Are More Than Just "ON/OFF"
Mr. Nguyễn Xuân Đàm
Vietnam Chief Representative, Jung Asia
10:30 - 11:40
Session
SOLUTION UPDATES FOR MEP:
Part 1 | 10:30 - 11:00: Nano-based passive fire protection materials & Acceptance fire protection
Mr. Vũ Tiến Dũng
Giám đốc, Công ty TNHH hóa chất xây dựng & công nghiệp MIVIKO
Part 2 | 11:00 - 11:20: Technical access panel solutions for MEP
Ms. Dương Hương Lê
Deputy Director, Tran Tech Building & Trading Co., Ltd
Part 3 | 11:20 - 11:40: Odor, flooding, and pest infestations: Causes and Solutions
Mr. Bạch Kim Khương
Researcher and Inventor – Vice Chairman
of the Vietnam Inventors Association, Technical Director, BKK
Afternoon 18.06
Afternoon 19.06
14:00 - 15:00
15:00 - 15:45
Session
Guest reception
Smart Air System Design in Modern Architecture
Mr. Võ Văn Hoàng
Member of VISRAE & ASHRAE
15:45 - 17:15
Seminar
MEP & INTERIOR COORDINATION:
CONFLICT RESOLUTION AND RISK MANAGEMENT
1. Ms. Vũ Thị Hồng Hạnh - Moderator
Head of Sales, AA Corporation
2. Arch. Lê Huy Trực
Design Director & Deputy General Director, TTT Corporation
3. Mr. Hồ Trọng Hiền
Managing Director, RFR FV Design Co., Ltd
4. Mr. Ngô Huy
MEPF Manager, Structon Group
5. Mr. Mai Chánh Thành
Managing Director, Central Construction JSC
6. Mr. Nguyễn Quốc Thống
Founder, C.space Design Complex
14:00 - 15:00
15:00 - 16:00
Session
Guest reception
TECHNOLOGY FOR MEP:
Part 1 | 15:00 - 15:30: AutoDesk for MEP
Mr. Trần Đỗ Khoa Tiến
Director, Arotech Vietnam
Mr. Nguyễn Ngọc Cường
Autodesk AEC Solution Consultant
Part 2 | 15:30 - 16:00: From Scan-to-BIMto Spatial Intelligence
Mr. Lâm Thanh Hoàng
CEO, ONE BIM Vietnam
16:00 - 17:30
Seminar
THE VALUES OF MEP: A RISK MANAGMENT PERSPECTIVE
1. Mr. Nguyễn Chánh Phương - Moderator
Vice President, AA Architecture Construction Joint Stock Company
2. Mr. Kim Valdbjørn Jensen
General Director, KiTec MEP Consultant
3. Mr. Lê Minh Văn
ME Manager, ICC Consultancy Jsc
4. Mr. Nguyễn Anh Thi
Deputy General Director, Searefico E&C
5. Mr. Đặng Việt Khoa
Managing Director, KAZE Interior Design Studio
6. Mr. Trần Minh Dương
Head of MEP Dept., GK Archi Co., Ltd.


2026 SPONSORS
.png)
.png)





2026 PARTNERS












SPEAKER 2026

























12-13 Duong N1, Khu TM Nam, KCX Tan Thuan, P. Tan Thuan Dong, Quan 7,
Ho Chi Minh City, Vietnam
Tel: +84 90 639 6358
Email: info@cspacevietnam.com.vn
Thanh Nhan (Mrs.)
Commercial & Operations Manager
E: nhan.trieu@cspacevietnam.com.vn
P: (+84) 975 112 194
Copyright © 2023 C space. All rights reserved.
Privacy Policy
Terms of Service
![[C.space] Logo.png](https://static.wixstatic.com/media/b69019_2dd4e882379b41b0b041cf0eb17f1dad~mv2.png/v1/fill/w_256,h_50,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/%5BC_space%5D%20Logo.png)






























